v0.5 -
Shelby area re-build started , road to Welker farm and area started -
Including all rail east and west as well as through Shelby, re-built -
Culbertson area along with scale/rest area re-worked -
Interchange to the oil rigs (between Culbertson and Williston) re-worked-
v0.4.5 -
Malta area re-built -
Missouri River south of Malta re-built -
MT66 re-worked -
US191 from Missouri to Malta re-worked -
US 2 from Malta to Glasgow re-worked -
US 2 west of Malta re-worked -
v0.4 -
Wolf Point area re-built -
Miles City area re-built -
Forsyth area and US 12 towards Roundup rebuilt -
MT24 from Glasgow to MT200 added -
Rest Area west of Circle at MT24 junction added -
v0.3.5
Glendive terrain re-work finished -
Circle terrain re-work finished -
farm south of Wolf Point re-worked -
Glasgow terrain re-worked, also corrected street and no more prefabs connected to prefabs -
started work on Ft Peck Resevoir -
all roads in gps had boundaries turned off -
Interstate 90/Hwy 212 junction (Crow Agency) re-built -
COMMENTS
https://forum.scssoft.com/viewtopic.php?f=194&t=273228
Write a comment